top of page

OFFSHORE
ENERGY

lattform.png

OFFSHORE ENERGY

References

Equinor
REFERENCES

Prosjekt Equinor – Lining 3“-4“-8“

Job Executed for costumer Aker solutions

EXECUTION OF LEAK WATER LINE AT MONGSTAD

3.2 km total pipe have been lined where the Leak

water was from Johan Sverdrup field.

UniPiSe helside - LEK Mongstad (003).jpg
UniPiSe helside - LEK Mongstad (005).jpg
UniPiSe helside - LEK Mongstad (004).jpg

Equinor
REFERENCES

FLOTATION TANK ON SFA AND GFA

Equinor – Flotasjons tanker

Job Executed for costume Equinor

Total lamination of flotation tanker with extended life. Build in a 7-layered system including 2 layered polyester cloth 2.5mm.

bilde 04.jpg
bilde 05.jpg
bilde 06.jpg

Equinor
REFERENCES

LINING "3-4"-8"

Equinor – lining

Job Executed for costume Aker Solution

Caisson 36,dimentions 26’’/DN660, pipe in Carbon steel + 2 x 3.5 m spools with 12” connections Produced water.

Constant temperature 80˚C  Peak temperature 99˚C

BILDE 02.jpg
BILDE03.jpg
BILDE 01.jpg

EQUINOR
Gullfaks A LQ

DRAINPIPE REHABILITATION

gullfaks rør.png

Moreld Apply
Gullfaks C 2023

Equinor – Open drain lining rehabilitation

Job Executed for costumeEquinor

Rehabilitation of drainage system from level 3 to level 9 (L11-L12-L13), including the open drain, kitchen, laundry room, and cabin annex.

 

Full lining of the entire pipe system in the living quarters. Pipe dimensions range from Dn.70 to DN150, using Loro-x pipes. The inner lining of corroded pipes was carried out without disrupting living quarters, with no need for disassembly or posing any risk to health, safety, and environment. The work was done as a closed system, ensuring a safe and efficient process for sewage rehabilitation.

gullfaks.png

Moreld Apply – Innerlining of collector pipe for torch

to liquid separator

INNERLINING OF

COLLECTOR PIPE

We conducted an inner lining of the collector pipe for torch to liquid separator in LT torch 43-VD02. The project involved epoxy lining of a fully welded 12˝ collector pipe, including branches through the fire wall.

 

The pipe dimensions, tank, pressure, and temperature specifications are as follows: 12" -6" Pipeclass AC17 sch20.

Job Description: Our scope of work included cleaning and applying a DN300 Epoxy liner over a 15m length. Additionally, we performed up milling of the 8˝ and 6˝ branches and installed 2 top hats to complete the project.

gr.jpg
kl.png
sds.png

Equinor
Sleipner R

Equinor – Rehabilitation of open drain system from upper mezz deck to under Main-deck

OPEN DRAIN SYSTEM

56_SLR/2023

We completed a full epoxy lining from stake/blind flanges and all drain-boxes, extending from the beginning to the end above the sea. The pipe dimensions, tank, pressure, and temperature specifications are as follows: DN 250/DN 200/DN 150/DN 100 carbon steel.

Job Description: Our scope of work involved installing an inside epoxy liner in the open drainpipes leading out to sea, including support pipes/reinforcement from the top deck on Sleipner R platform. Before applying the epoxy liner, we thoroughly cleaned the inside corrosion throughout the entire pipe system. Additionally, we installed Y-liners in other branches.

sleipner 03.png
sleipner 01.png
sleipner.jpg
bottom of page