top of page

OFFSHORE
ENERGY

lattform.png

OFFSHORE ENERGY

References

01

Equinor
REFERENCES

EXECUTION OF LEAK WATER LINE AT MONGSTAD

Prosjekt Equinor – Lining 3“-4“-8“Job Executed for costumer Aker Solutions

3.2 km total pipe have been lined where the Leak water was from Johan Sverdrup field.

Pipeliner- UniPiSe - LEK Mongstad reference
Pipeliner UniPiSe  - LEK Mongstad reference

02

Equinor
REFERENCES

FLOTATION TANKS ON SFA AND GFA

Equinor – Flotation tanks. Job Executed for costumer Equinor

Total lamination of flotation tanks with extended life. Build in a 7-layered system including 2 layered polyester cloth 2.5mm.

Pipeliner- flotation tanks- Equinor reference
Pipeliner- flotation tanks- Equinor reference
Pipeliner- flotation tanks- Equinor reference

03

Equinor
REFERENCES

LINING "3-4"-8"

Equinor – lining. Job Executed for costume Aker Solutions

Caisson 36, dimentions 26’’/DN660, pipe in Carbon Steel + 2 x 3.5 m Spools with 12” connections Produced water.

Constant temperature 80˚C Peak temperature 99˚C

Pipeliner- lining job - Aker Solutions reference
Pipeliner- lining job - Aker Solutions reference
Pipeliner- lining job - Aker Solutions reference

04

EQUINOR
Gullfaks A LQ

DRAINPIPE REHABILITATION

Equinor – Open drain lining rehabilitation. Job Executed for costumer Equinor

Rehabilitation of drainage system from level 3 to level 9 (L11-L12-L13), including the open drain, kitchen, laundry room, and cabin annex.

 

The full lining of the entire pipe system in the living quarters. Pipe dimensions range from Dn.70 to DN150, using Loro-x pipes. The inner lining of corroded pipes was carried out without disrupting living quarters, with no need for disassembly or posing any risk to health, safety, or the environment. The work was done as a closed system, ensuring a safe and efficient process for sewage rehabilitation.

05

Moreld Apply
Gullfaks C 2023

INNERLINING OF COLLECTOR PIPE

Moreld Apply – Innerlining of collector pipe for torch to liquid separator

We conducted inner lining of the collector pipe for the torch to the liquid separator in LT torch 43-VD02. The project involved epoxy lining of a fully welded 12˝ collector pipe, including branches through the firewall. The pipe dimensions, tank, pressure, and temperature specifications are as follows: 12" -6" Pipeclass AC17 sch20.

Job Description: Our scope of work included cleaning and applying a DN300 Epoxy liner over a 15m length. Additionally, we performed up milling of the 8˝ and 6˝ branches and installed 2 top hats to complete the project.

Pipeliner-innerlining - Gullfaks A LQ reference
Pipeliner-innerlining - Gullfaks A LQ reference
Pipeliner-innerlining - Gullfaks A LQ reference
Pipeliner- open drain - Gullfaks A LQ reference
Pipeliner- open drain - Gullfaks A LQ reference

06

Equinor
Sleipner R

OPEN DRAIN SYSTEM

56_SLR/2023

Equinor – Rehabilitation of open drain system from Upper mezz-deck to under Main-deck

We completed a full epoxy lining from stake/blind flanges and all drain-boxes, extending from the beginning to the end above the sea. The pipe dimensions, tank, pressure, and temperature specifications are as follows: DN 250/DN 200/DN 150/DN 100 carbon steel.

Job Description: Our scope of work involved installing an inside epoxy liner in the open drain pipes leading out to sea, including support pipes/reinforcement from the top deck on the Sleipner R platform. Before applying the epoxy liner, we thoroughly cleaned the inside corrosion throughout the entire pipe system. Additionally, we installed Y-liners in other branches.

Pipeliner-open drain system - Equinor reference
Pipeliner-open drain system - Equinor reference
bottom of page